FireBox S327 and S330 FAQ

Engine, startup, loading, ash removal and maintenance answers for the Air Burners FireBox S327 and S330. See the FireBox S-300 Series for specifications and machines available now.

Air curtain burner and excavator burning land-clearing debris

62 questions in 1 section. Section 1 is open; select any question to read its answer.

1
Section 1 · Questions 1–62

FireBox S327 and S330 Operation and Maintenance

62 questions
1

What engine and drive coupling configuration is installed on the S327 and S330 FireBox?

A HATZ 4H50-TIC Tier 4 Final diesel engine equipped with a fluid coupling (automatic clutch) and direct coupling mechanical drive. At times you will find them with Kubota engines. We have used John Deere, Perkins, and Cummins also. New from the factory now they are using Hatz.

2

What is the overall length, width, and height of the S330 FireBox?

The overall size of the S330 is 40 ft 4 in length x 11 ft 10 in width x 9 ft 6 in height.

3

What are the internal firebox (burn chamber) dimensions of the S330 FireBox?

The internal firebox dimensions of the S330 are 30 ft 2 in length x 8 ft 5 in width x 8 ft 1 in height.

4

What is the total approximate operating weight of the S330 FireBox?

Approximately 59,000 lb. (26,760 kg).

5

What is the average throughput capacity of the S330 FireBox?

Approximately 11 to 13 tons per hour.

6

What are the overall dimensions (L x W x H) of the S327 FireBox?

The overall size of the S327 is 37 ft 4 in length x 11 ft 10 in width x 9 ft 6 in height.

7

What are the internal firebox (burn chamber) dimensions of the S327 FireBox?

The internal firebox dimensions of the S327 are 27 ft 2 in length x 8 ft 5 in width x 8 ft 1 in height.

8

What is the total approximate weight of the S327 FireBox?

Approximately 54,600 lb. (24,800 kg).

9

What is the average throughput capacity of the S327 FireBox?

Approximately 9 to 11 tons per hour.

10

What is the average diesel fuel consumption rate for the S327 and S330 FireBox models?

Approximately 3.0 gallons per hour at average operating RPM.

11

What is the minimum diesel fuel tank capacity on the S327 and S330 FireBox?

Minimum 110 gallons (416 Liters).

12

What electric motor option and variable frequency drive configuration are available for the S327 and S330 FireBox?

A heavy-duty 3-phase electric motor equipped with an enclosed pre-programmed variable frequency speed controller (VFD), accepting Three Phase 480V (50Hz or 60Hz), or optional 400V/415V.

13

What type of base frame structure is used on the S327 and S330 FireBox?

A heavy skid-type base frame open to the earthen soil designed for dragging across the ground on site.

14

How much do each of the rear access and clean-out doors weigh on the S327 and S330 FireBox?

Each refractory-lined rear door weighs approximately 2,000 lb.

15

What terrain slope limitation must be strictly observed before opening the 2,000 lb rear doors on the S327 and S330 FireBox?

The rear doors should not be opened if the FireBox is inclined on any axis more than 5 degrees.

16

Why must dirt be shoveled around the inside bottom rails of the S327 and S330 FireBox during site placement?

To seal openings under the skids caused by uneven ground terrain, preventing heat and smoke from escaping and stopping hot gas from reaching the forward equipment deck.

17

Why is digging an earthen pit in the center of the S327 and S330 FireBox strictly prohibited?

Digging a pit makes it difficult to seal the unit, pit walls deteriorate during burning, and escaping heat under the engine deck can create severe deck hazards and voids the factory warranty.

18

On what surface types is it strictly prohibited to operate the S327 and S330 FireBox?

Combustibles (dry grass, peat moss), concrete pads, asphalt, gravel, or crushed stone surfaces.

19

Why will operating the S327 or S330 FireBox on a concrete pad or gravel cause an explosion hazard?

Trapped moisture inside the concrete or rock vaporizes rapidly from intense downward heat, generating extreme internal pressure that causes concrete or stones to explode violently.

20

Why must the HATZ diesel engine on the S327 and S330 FireBox be warmed up and then shut down prior to lighting the fire?

Because the fluid coupling spins the fan even at idle, which creates air movement that makes lighting difficult and can blow out a newly lit fire.

21

What is the base engine idle speed on the S327 and S330 FireBox?

900 RPM.

22

What is the warm-up and cool-down throttle setpoint on the S327 and S330 FireBox?

1400 RPM.

23

What is the Operating Low engine RPM setting specifically for the S327 FireBox?

2200 RPM.

24

What is the Operating Low engine RPM setting specifically for the S330 FireBox?

2300 RPM.

25

What is the Operating High (maximum operating) engine RPM setting specifically for the S327 FireBox?

2500 RPM.

26

What is the Operating High (maximum operating) engine RPM setting specifically for the S330 FireBox?

2600 RPM.

27

How does the fluid coupling behave when the ignition switch is turned to OFF on the S327 and S330 FireBox?

The air fan free-wheels through the fluid coupling and gradually spins to a stop without harming the engine.

28

What function does turning the ignition key to the 'Auto' position have on the S327 and S330 FireBox?

The 'Auto' key position is non-functional and not used for the HATZ diesel engine.

29

What must be done before performing any welding repairs on the S327 and S330 FireBox?

Disconnect the negative battery cable and physically remove the Electronic Control Module (ECM) from the engine brackets to prevent destroying the computer controller.

30

Why is loading over the air manifold recommended for the S327 and S330 FireBox?

Loading over the manifold is the safest side for personnel from escaping embers and reduces the risk of excavator implements accidentally striking and damaging the manifold.

31

How is a cold start fire ignited inside the S327 and S330 FireBox?

From the bottom through the dedicated side access doors in the panels on the manifold side of the machine, using a propane torch or oil-soaked rags on poles.

32

How much diesel fuel is sprayed over the initial wood bed when cold lighting the S327 or S330 FireBox?

Approximately 10 gallons spread across the initial half-full load of dry wood, concentrating near the side lighting holes and back wall.

33

How does the operator 'fan' the young fire during startup in the S327 FireBox?

By increasing engine speed from 1400 RPM up to 2500 RPM for 3 to 8 minutes, then throttling back to 1400 RPM to spread the flames without blowing the fire out.

34

How does the operator 'fan' the young fire during startup in the S330 FireBox?

By increasing engine speed from 1400 RPM up to 2600 RPM for 3 to 8 minutes, then throttling back to 1400 RPM to spread the flames without blowing the fire out.

35

What load height restriction applies when burning wooden pallets in the S327 and S330 FireBox?

Do NOT load higher than approximately 3/4 of the firebox height, as spent pallets burn intensely hot and will warp or destroy the air manifold.

36

When burning clean logs and wood debris, what is the maximum load level inside the S327 and S330 FireBox?

Just below the bottom of the air manifold nozzles; loading higher breaks the air curtain and causes smoke emissions.

37

When is the best time to load heavy tree stumps into the S327 and S330 FireBox?

After the first hour of burning once the base fire has achieved full operating temperature.

38

How far in advance of site shutdown must wood waste loading cease on the S327 and S330 FireBox?

Loading should stop 1 to 2 hours before planned shutdown.

39

What flame clearance distance to the manifold is required before shutting down the engine on the S327 and S330 FireBox?

DO NOT shut off the engine or airflow while there are still flames within 24 inches of the manifold, as radiant heat will warp the manifold assembly.

40

To what residual bed depth must the fire burn down before the engine can be turned off on the S327 and S330 FireBox?

When the fire has burned down to about 1 or 2 feet and no flames are visible near the manifold.

41

Why must water never be sprayed onto the interior walls of the S327 and S330 FireBox during shutdown?

Cold water sprayed onto hot refractory ceramic panels causes thermal shock cracking and severe panel deterioration.

42

What is the maximum permissible ash depth inside the S327 and S330 FireBox before cleanout is mandatory?

No more than 3 feet of ash (which represents approximately 20 hours of burning operations).

43

Why does operating efficiency drop when ash depth exceeds 3 feet in the S327 and S330 FireBox?

Excess ash reduces combustion chamber volume, impairs internal circular airflow, and risks unburned embers being blown out of the box.

44

How is daily ash cleanout performed on the S327 and S330 FireBox when preserving an ember bed for a hot restart?

By opening the rear doors and scooping out 1 or 2 scoops of ash with an excavator or specialized Air Burners ash rake, leaving a bed of glowing coals. When you cover with dirt at the end of the day the coals will remain hot until the next day or longer.

45

What dragging procedure is used to empty the entire ash bed from the S327 and S330 FireBox at the end of a job?

Open the rear doors, cover the ash bed with a thin layer of dirt to control dust, attach certified cables to the front pull block or pad eyes, and drag the skid forward. Be sure to secure the doors wide open or you will break them.

46

What safety rule applies to walking inside the S327 or S330 FireBox during dragging operations?

NEVER walk or stand inside the FireBox while it is being towed or dragged; dirt buildup under skids can lift and dislodge 2,000 lb ir heavier panels onto personnel.

47

How many lifting pad eyes are equipped on the S327 and S330 FireBox for crane handling?

Four (4) designated lifting pad eyes (two on each side) marked with yellow 'Lifting Point' decals with up-arrows.

48

What safety rules must be followed when utilizing the observation ladder on the S327 and S330 FireBox?

Only authorized personnel wearing PPE may use the ladder, they must maintain a firm grip on the handle, and they must never step beyond the top ladder rung.

49

What model and size flexible drive coupling is installed between the engine and air fan on the S327 and S330 FireBox?

Dodge Raptor Coupling Size E30 (Air Burners Part Number 5000-2120).

50

What is the required hub gap measurement 'A' for the Dodge Raptor E30 coupling on the S327 and S330 FireBox?

2.55 inches (65 mm).

51

What is the maximum allowable angular misalignment value 'C' for the Dodge Raptor E30 coupling on the S327 and S330 FireBox?

0.284 inches (7.2 mm).

52

What is the maximum allowable parallel misalignment value 'D' for the Dodge Raptor E30 coupling on the S327 and S330 FireBox?

0.188 inches (4.8 mm).

53

What tightening torque is specified for the 3/8-inch element flange bolts on the Dodge Raptor E30 coupling of the S327 and S330 FireBox?

42 ft-lbs (502 in-lbs / 57 N�m).

54

Can the Dodge Raptor element bolts be reused after disassembly on the S327 and S330 FireBox?

No, bolts should be used only one time because they feature factory pre-applied thread-locking patches.

55

How is shaft alignment corrected if the Dodge Raptor E30 coupling on the S327 and S330 FireBox exceeds tolerance?

By adjusting the four (4) elastomeric engine isolators (motor mounts) beneath the engine base.

56

What is the lubrication interval and grease amount for the air fan bearings on the S327 and S330 FireBox?

Relubricate both inside and outside fan bearings every 2,100 hours of runtime with 12.5 g (0.44 oz.) of SKF LGMT 3IN/18 grease.

57

What is the lubrication interval and grease amount for the fluid coupling bearing on the S327 and S330 FireBox?

Relubricate every 120 hours of runtime with 10 g (0.35 oz.) of SKF LGMT 3IN/18 grease.

58

What service interval is required for factory servicing of the fluid coupling on the S327 and S330 FireBox?

Every 2 years or as needed through Air Burners Technical Support.

59

What engine oil viscosity and crankcase capacity are required for the HATZ 4H50 engine in the S327 and S330 FireBox?

10W40 or 15W40 Diesel Grade (Ultra-Low Sulfur); oil capacity is 7.4 quarts (7.0 Liters).

60

What is the routine maintenance interval for engine oil, oil filter, and air filter elements on the S327 and S330 FireBox?

Initial service after the first 50 operating hours, then every 500 operating hours thereafter.

61

What patching compound is specified for repairing surface cracks in the refractory panels of the S327 and S330 FireBox?

Air Burners Part # 6900-1003 'Thermal-Ceramic Wet Pre-Mix' air-cured compound.

62

How long must the thermal-ceramic patching compound cure before the S327 or S330 FireBox can be returned to service?

Allow the patching material to harden overnight before firing the machine.